Concrete
Crusher
CC480

1
2
3
4
5
6

Concrete
Crusher
CC480

1
Optionally with hydr. rotary drive

Enables easy, precise and efficient positioning for best results.

2
Pivot bearing for 360° rotation

For mechanical positioning.

3
Integrated pressure booster

Full crushing force always guaranteed independent of the inlet pressure of the carrier.

4
Interchangeable reinforcement blades

Durable robust rebar cutting blades for strong reinforcements.

5
Exchangeable crushing tips

Increase productivity by shortening machine downtime and reducing maintenance costs for time-consuming buildup welding.

6
Optionally with additional crushing tips

Quickly mounted for best result even with thinner materials.

Concrete
Crusher
CC480

1
2
3
4
5
6

Concrete
Crusher
CC480

1
Optionally with hydr. rotary drive

Enables easy, precise and efficient positioning for best results.

2
Pivot bearing for 360° rotation

For mechanical positioning.

3
Integrated pressure booster

Full crushing force always guaranteed independent of the inlet pressure of the carrier.

4
Interchangeable reinforcement blades

Durable robust rebar cutting blades for strong reinforcements.

5
Exchangeable crushing tips

Increase productivity by shortening machine downtime and reducing maintenance costs for time-consuming buildup welding.

6
Optionally with additional
crushing tips

Quickly mounted for best result even with thinner materials.

Products  |  Concrete Crushers  |  CC480

Darda
Concrete
Crushers
make the
difference

50 t crushing force

Independent of carrier due to Darda pressure booster.

Small carriers in confined spaces

Limited access, low load capacity not a problem.

460 mm large opening width

Easy positioning and demolition of thick concrete parts.

Low noise demolition

Possible indoors during ongoing operation.

187 t cutting force

Use even with very strong reinforcing rebars.

Additional crushing tips

More productivity even with thinner material.

Specifications
CC480

Weight
275 kg
Jaw opening
460 mm
Recommended carrier weight
4 - 6 t
Crushing force A, max.
490 kN (50 t)
Cutting capacity, max.
1x Ø 30 mm
Data sheet CC480 | PDF | 551 KB
Catalog | PDF | 17 MB

Options

Best
power-to-weight
ratio on
the market

For
carriers
from 4 - 6 t

Compact and
powerful

Darda’s compact and powerful Concrete Crusher show their strength especially in indoor demolition in very confined spaces, during running operations or in busy environments, but also as an all-round Concrete Crusher in many other applications. With significantly lower emissions compared to other demolition methods in terms of noise level, shocks and vibrations, you work safely and effectively!

The Darda CC480 can be upgraded – depending on the type of work to be done – with hydraulic rotary drive and additional crushing tips.