Products | Rock and Concrete Splitters | C4E
Can be used independently everywhere
Powerful in seconds
Low vibration and dust, almost noiseless
Economical and safe
Precise measurement can be controlled at any time
Robust and light
Options
and Accessories

Special lubricant
Lubrication of the pressure surfaces of the wedge and the counter wedges
guarantee maximum utilization of splitting force and reduction of wear.
Water resistant.
Taking advantage of the low tensile strength of rock and concrete, the hydraulic splitting cylinders allow controlled, quiet and cost-effective demolition from the inside!
The C4E splitting cylinder is well established in the natural stone industry for block extraction of both hard and soft rock such as marble and granite. It is also used in the demolition of rocks and natural stone, in secondary splitting of boulders, as well as in tunnel driving, extension in underground mining and knapping work, as well as press pipe jacking.
The handy Rock and Concrete Splitter has an enormous power-to-weight ratio. One person can work in any position and even under water, while other work continues in parallel: Low noise, without vibrations and flying stones.
Conventional mechanical methods destroy the structure of the material by applying external force. Rock and concrete, however, can withstand very large compressive forces from the outside. In comparison, the resistance to a force acting from the inside out is relatively low. The development of the Darda Rock and Concrete Splitter was based on this fact.
Safe wedge
principle
First, a hole of the appropriate depth and diameter is drilled, into which the splitting insert of the splitting cylinder is then inserted and aligned to determine the splitting direction. With hydraulic pressure, the wedge pushes itself between the two counter wedges and presses them apart. The effective splitting force of up to 413 tons or 4048 kN destroys the structure of concrete and rock from the inside. A split is created in a matter of seconds. Thinner reinforcing bars in reinforced concrete tear off.

A complete
Splitting Unit
consists of three
components:

1. Hydraulic Splitter
2. Hydraulic Power Unit
3. Hydraulic hose set (high and low pressure)