Multi Cutter
MC200

1
2
3

Multi Cutter
MC200

1
360° hydraulic rotary drive

Easy positioning of the cutting blades with high precision.

2
Slim design

Rugged and compact, for easy handling even in hard-to-reach places.

3
Cutting blades can be easily regrinded

Low wear costs, as cutting blades have been designed that they can be re-grinded by the user himself.

Multi Cutter
MC200

1
2
3

Multi Cutter
MC200

1
360° hydraulic rotary drive

Easy positioning of the cutting blades with high precision.

2
Slim design

Rugged and compact, for easy handling even in hard-to-reach places.

3
Cutting blades can
be easily regrinded

Low wear costs, as cutting blades have been designed that they can be re-grinded by the user himself.

Products  |  Multi Cutters  |  MC200

Darda
Multi Cutters
make the
difference

Controlled cutting

Utility lines, pipes, cables, steel beams and more.

Safe use

Low noise, dust and vibration.

High productivity

Easy re-grinding of the cutting blades.

Small carriers

Limited access/load – no problem.

Powerful in confined spaces

Small and compact with 50 t cutting force.

Stability guaranteed

Safe pulling down and lifting of installations.

Specifications
MC200

Weight
147 kg
Jaw opening
200 mm
Recommended carrier weight
1.2 - 2.8 t
Cutting force, max.
490 kN (50 t)
Data sheet MC200 | PDF | 199 KB
Catalog | PDF | 17 MB

For
carriers
from 1.2 - 2.8 t

Use for
internal coring

Break-up work
at a high level

The compact and powerful Multi Cutter from Darda shows its strength especially in internal coring in very confined spaces, during operation or in busy environments, in the field of industrial demolition when cutting steel structures, supply lines and pipes, as well as in the recycling of metal structures and cables in scrap yards.

Darda
Multi Cutters

News and
Stories

Job Report C12 – HCS8 – Underwater demolition Underwater demolition of concrete piles Read more
Job Report Rock- and Concrete Splitter C9 Tunneling Tunnel extension in a dam Read more
Job Report Rock and Concrete Splitter C12 – Concrete Pillars Cutting of concrete pillars in 5 minutes Read more
Job Report Tank Cutter TC120 – Environmental Engineering Dismantling a tank 8 m length x 1.8 m height Read more