Products | Hydraulic Power Units | D4
Darda Hydraulic
Power Units make
the difference
Safety
Mobility
Productivity
User-friendly
High performance
Low maintenance costs
Accessories

Quick couplings

D4 – reliable
high pressure
With the D4 mobile diesel high-pressure hydraulic power unit, you are always quickly ready for operation and independent of other operating sources.
This model is designed for areas where electric or gasoline powered units are not allowed and where you need a power unit that can run continuously for many hours without interruption. Equipped with manual start as standard, but also available with electric start. An optional manifold allows up to 5 Rock and Concrete Splitters to be connected and run in parallel. It reliably supplies the Darda handheld demolition equipment with a system pressure of 500 bar. The side supports on the robust and tilt-resistant steel frame allow easy transport of the equipment, also thanks to the large pneumatic tires. The diesel-powered high-pressure hydraulic unit is certified according to EU 2016/1628 Stage 5 and is the ideal companion for daily use, especially in natural stone quarrying.