Concrete
Crusher
CC260

1
2
3
4

Concrete
Crusher
CC260

1
Pivot bearing for 360° rotation

For mechanical positioning.

2
Integrated pressure booster

Full crushing force always guaranteed independent of the inlet pressure of the carrier.

3
Interchangeable reinforcement blades

Durable robust rebar cutting blades for strong reinforcements.

4
Exchangeable crushing tips

Property right: registered design. Increased productivity by shortening machine downtime and reducing maintenance costs for time-consuming buildup welding.

Products  |  Concrete Cruhsers  |  CC260

Darda
Concrete
Crushers
make the
difference

22 t crushing force

Due to Darda pressure booster
independent of carrier.

Small carriers in confined spaces

Limited access, low load capacity no problem.

250 mm large opening width

Easy positioning and demolition of thick concrete parts.

Low noise demolition

Possible indoors during operation.

43 t cutting force

Use even with very strong reinforcing bars.

Exchangeable crushing tips

Property right: registered design. Reduced machine downtime.

Specifications
CC260

Weight
74 kg
Jaw opening
250 mm
Recommended carrier weight
0.7 - 1.2 t
Crushing force, max.
220 kN (22 t)
Cutting capacity, max.
1x Ø 16 mm
Data sheet CC260 | PDF | 332 KB
Catalog | PDF | 17 MB

Options

Best
power-to-weight
ratio on
the market

For
carriers
from 1.2 t

Small and
compact
With great
crushing force

The compact and powerful Concrete Crusher from Darda show their strength especially in indoor demolition in very confined spaces, during operation or in busy environments, but also as an all-round Concrete Crusher in many other applications. Work effectively and safely with significantly lower emissions compared to other demolition methods in terms of noise level, shocks and vibrations!